Most engineering teams measure change approvals as one number: the days between submission and release. That single number hides the problem. The elapsed time may include substantial waiting between review steps; the balance varies by team and change type.
This guide shows you how to split engineering change order cycle time into working time and waiting time using event timestamps already sitting in your PLM or workflow system. You will see how to define each event, build a labeled ECO timeline segmented by complexity and risk, and then prioritize routing and capacity changes that shrink queues while keeping every required technical approval and audit trail intact.
Key Takeaways
- Measure submission-to-release time consistently.
- Separate active work from waiting and rework.
- Compare changes within risk and complexity groups.
- Test routing and capacity changes against queue age.
- Preserve required approvals and traceability.
Start with the question that drives everything else.
Where Is Engineering Change Order Cycle Time Being Lost?

Ask ten engineers where the time goes and most will say approvals. Ask the approvers and most will say the packages arrive incomplete. Both answers are partly right, and timestamps settle the argument.
As ASQ's value stream mapping guidance explains, a process map can capture both processing and waiting time. Think of an ECO as a part moving through a shop. It has touch time and it has wait time.
Treating them as one number is like quoting a machining job by counting the days the part sat on a cart.
Start with six useful event definitions for each change. Define them once, in writing, and apply them the same way across sites.
1. Submission
The moment the originator releases the change package for processing. This is the clock start, and it should be the system event, not the date typed into a form field.
2. Queue Entry
The moment the package becomes available to a named reviewer or board. The interval to first reviewer action estimates queue time if the system captures those events reliably.
3. Review
Active technical assessment. Measure it as the span from first reviewer open to decision recorded, and accept that it is an approximation.
4. Clarification
Any outbound question to the originator or a supporting function. Track clarification separately; it can reflect missing inputs, unclear requirements, or questions raised during review.
5. Rework
The originator revising drawings, BOM lines, or justification before resubmission. Record each rework loop and its duration separately.
6. Release
Final approval and effectivity set. Downstream tasks such as supplier notification deserve their own measure rather than being folded into approval performance.
Once those definitions exist, the timeline analysis becomes straightforward arithmetic.
Building a Labeled ECO Timeline Segmented by Complexity and Risk
As a starting sample, pull ninety days of closed changes, or a longer period if volume is low. Export the event timestamps, calculate the gap between each consecutive pair, and label each gap as work, queue, clarification, or rework. Then segment the records so you are not averaging a fastener substitution with a safety-critical redesign.
Three illustrative segments can help you start. Keep the rules objective so anyone can classify a change the same way.
| Segment | Typical Content | Where Time Is Lost | First Action |
|---|---|---|---|
| Low complexity, low risk | Documentation corrections, note changes, cosmetic updates | Approval queues behind unrelated work | Separate lane with reduced reviewer set |
| Moderate complexity, moderate risk | Supplier substitutions, tolerance adjustments, tooling updates | Clarification loops and incomplete packages | Standard submission checklist and named owner |
| High complexity, high risk | Form, fit, function changes affecting safety or regulated attributes | Board scheduling and sequential sign-off | Scheduled cadence plus parallel review |
The value stream mapping symbols guide shows how to distinguish processing and waiting on a timeline. Plot each segment as a horizontal bar with distinct colors for work, queue, clarification, and rework. A change with brief active review may still spend days waiting; use your records to establish the actual split.
The detail helps identify which fix applies. For a broader example, see streamlining value streams with Lean. Queue-dominated changes need routing and capacity work.
Clarification-dominated changes need better inputs at submission.
Teradyne offers a useful reference point. In a Siemens case study of Teradyne, the company reported an 84 percent reduction in engineering change-order cycle time alongside significant cost savings after consolidating and restructuring how changes were managed. The case study attributes the change to automation, streamlined management, and better access to accurate information.
With the timeline built, the next decision is which lever to pull first.
Prioritizing Change Routing Fixes That Shorten Approval Queues

Routing decides how many queues a change must survive. A single sequential route can make simple changes wait behind complex ones. Check the actual routing and approval requirements before changing it.
Work through these in order. Each one is reversible if the data disagrees.
- Split the lanes. Create a documented fast lane for low-risk, low-complexity changes with a defined scope boundary. Anything outside the boundary routes to the standard path automatically.
- Convert sequential approvals to parallel. If manufacturing, quality, and purchasing do not depend on each other's conclusions, send the package to all three at once. Measure the effect in a pilot; the time saved depends on the route and reviewer availability.
- Reduce reviewer count to the required set. Audit who must approve versus who was added years ago for visibility. Move the informational reviewers to notification, and keep every required technical approval in place.
- Name a backup for every approver role. Single-point reviewers create queues every time someone travels. Backups should be pre-authorized, not arranged by email when a change stalls.
- Set a submission completeness gate. A short checklist can catch missing drawings, impact assessments, and effectivity information before routing.
- Schedule board capacity against demand. If forty changes arrive weekly and the board clears twenty-five, the backlog is arithmetic, not attitude. Add a session or expand delegated authority within defined risk limits.
- Publish queue age, not just closure counts. A visible oldest-item metric changes behavior faster than a monthly average. Review it weekly with the engineering leads and watch for unintended quality effects using balancing measures in DMAIC projects.
Capacity deserves its own look, because routing fixes stall when reviewers are structurally overloaded.
Capacity Choices That Reduce ECO Lead Time Without Weakening Review
As reviewer workload approaches available capacity, queues can grow quickly. Compare arrivals, completion rates, and queue age before deciding whether routing or capacity is the constraint.
Several adjustments protect technical rigor while adding throughput.
- Protected review blocks. Reserve review time based on incoming volume and the work each reviewer must complete.
- Delegated authority with written limits. Define exactly which change classes a senior engineer may approve alone and record the delegation in the system.
- Cross-trained secondary reviewers. Depth matters more than headcount when one discipline is the chronic bottleneck.
- Batch size reduction. A weekly board may leave a change waiting nearly a week before its next meeting. Test whether more frequent sessions reduce that interval.
- Traceability by default. Every decision, comment, and delegation stays in the record, so faster routing never costs you the audit trail.
If a small group carries most approvals, compare its queue age with other reviewer groups. Reassign eligible change classes only within documented authority and check the effect on median lead time and quality.
Teams that want structured help moving from timeline analysis to a controlled project often bring in Six Sigma consulting support or enroll their change board in process improvement training. Choose the support model based on available internal capacity and the scope of the improvement effort.
AirAcad Resources for Reducing Engineering Change Delays

Separating review work from queue time requires mapping skills, timestamp analysis, and a disciplined way to carry findings into a change. These four offerings from Air Academy Associates cover that path, from drawing the current process to running a controlled improvement project.
VSM With IPO and SIPOC
VSM With IPO and SIPOC teaches value stream mapping alongside input-process-output and SIPOC framing. For an ECO process, that means naming every handoff between originator, reviewer, board, and document control. You will define process boundaries clearly, so queue time between steps becomes visible rather than buried inside an average.
Apply it by mapping one change category and marking each waiting point directly on the map.
Lean Principles and Tools
Lean Principles and Tools covers flow, waste identification, and pull concepts in practical terms. Waiting and rework are common forms of waste; your timeline shows their share of this approval process. The course helps you connect queue reduction to non-value-added delay instead of pushing reviewers to work faster.
Use it to justify parallel routing, smaller batches, and reduced reviewer lists with reasoning your leadership will accept.
Historical Data Analysis Short Course
The Historical Data Analysis Short Course focuses on getting insight from data your systems already captured. ECO timestamps qualify.
You will practice examining distributions and variation rather than relying on a single average, which matters because change categories behave very differently. Apply it by comparing queue time across complexity segments and identifying which reviewer or category drives the longest tail.
Lean Six Sigma Green Belt Online Course
The Lean Six Sigma Green Belt Online Course gives you the DMAIC structure to turn findings into a managed project. Self-paced modules fit around engineering workloads. You will define the problem, measure baseline ECO lead time, test routing changes, and build controls that hold the gain.
A suitable ECO process can serve as a project subject when the course requirements and access to data allow it.
Final Word
Review the event data before assuming reviewer productivity is the cause. Pull your timestamps, label the segments, and fix the routing first. Explore our courses or request a consultation when you are set to begin.
Air Academy Associates offers Lean Six Sigma training and consulting to help teams map ECO delays and test practical improvements.
FAQs
How Is Engineering Change Order Cycle Time Measured?
Measure engineering change order (ECO) cycle time from the official "submit" timestamp to the "final approval/release" timestamp, then break it into components: active work (engineering review, analysis, rework) and waiting (time sitting in inboxes/queues). Use workflow logs to capture start/stop times for each step, report medians and percentiles (not just averages), and track first-pass yield and number of review loops to pinpoint where delays originate—an approach we routinely apply in Lean Six Sigma and DOE-based improvement efforts.
How Can Review Time Be Separated From Approval Queue Time?
Define "review time" as the cumulative time a reviewer is actively working on the ECO (start when they open/accept it; pause when they return it or stop work), and define "queue time" as the elapsed time between handoffs when no one is actively working. Implement clear status codes (e.g., In Review, Waiting for Reviewer, Waiting for Requester, Waiting for Approver), require "accept/claim" actions to start the clock, and use automated system timestamps to calculate each bucket—this separation is a standard measurement system step in disciplined process improvement.
Which Changes Reduce Waiting Without Weakening Technical Review?
Reduce waiting by clarifying routing and decision rights (standard approval matrix), using risk-based pathways (fast-track low-risk changes; full review for high-risk), improving input quality (complete checklists and templates to cut rework loops), setting service-level targets for each role, limiting work-in-process (WIP) to prevent overload, and enabling parallel reviews where appropriate. Pilot changes with clear metrics (queue time, defects/escapes, rework rate) to ensure speed gains don't compromise quality—an evidence-based approach we emphasize in DFSS and Lean Six Sigma deployments.